DocumentCode
3421153
Title
Research on shear model of ring joint bolts in stragger- jointed segmental linings
Author
Jiang An-long ; Yang Zhao
Author_Institution
Sch. of civil Eng., Nanchang Hangkong Univ., Nanchang, China
Volume
3
fYear
2010
fDate
25-27 June 2010
Abstract
A new model of joints between lining circle is proposed according to the characteristic of stagger-jointed assembling shield tunnel. The method of ascertaining the parameters and the range of the parameters are given in this paper. Using this model, a qusi-3D simulation model is obtain to analysis the internal force of segmental linings in stagger-jointed assembling. The operation stage of a water diversion tunnel in Shanghai is analyzed, which indicates that the stagger-jointed assembling structure´s relative displacement is less than straight-joint assembling structure and its internal force is larger than straight-joint assembling structure. It shows that the bilinear shear model is effective to reflect the constraint effect of stagger-jointed segmental linings of shield tunnel.
Keywords
assembling; fasteners; rings (structures); shear strength; tunnels; Shanghai; bilinear shear model; qusi-3D simulation model; ring joint bolts; stagger-jointed assembling shield tunnel; stragger-jointed segmental linings; water diversion tunnel; Analytical models; Assembly; Civil engineering; Design engineering; Design methodology; Fasteners; Geologic measurements; Geology; Mathematics; Springs; assembling; segmental linings; shield tunnel; stagger-jointed; tunneling engineering;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Design and Applications (ICCDA), 2010 International Conference on
Conference_Location
Qinhuangdao
Print_ISBN
978-1-4244-7164-5
Electronic_ISBN
978-1-4244-7164-5
Type
conf
DOI
10.1109/ICCDA.2010.5540995
Filename
5540995
Link To Document