• DocumentCode
    3441527
  • Title

    Notice of Retraction
    Competitive procurement mode choosing of general equipment maintenance materiel

  • Author

    Xiao Chen ; Woye Liu ; Minfang Zhang ; Fei Han

  • Author_Institution
    Dept. of Equip. Command & Manage., Ordnance Eng. Coll., Shijiazhuang, China
  • fYear
    2013
  • fDate
    15-18 July 2013
  • Firstpage
    1557
  • Lastpage
    1560
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    In order to solve the prominent problems such as slowness, subjectivity and inclination of human factors in competitive procurement method selection for general equipment maintenance materials, based on five key indexes including confidentiality, security, number of qualified suppliers, fund saving rate and project time limit, this paper presented a new quantitative model for procurement method selection through fuzzy analytic hierarchy process and optimization ranking of conflicting data. Quantitative calculation can aid fast decision-making on procurement method selection, which is superior to human selection. The establishment of such quantitative model provides a powerful auxiliary tool for decision making with respect to material procurement management.
  • Keywords
    analytic hierarchy process; decision making; fuzzy set theory; maintenance engineering; military equipment; procurement; competitive procurement method selection; competitive procurement mode; confidentiality; conflicting data optimization ranking; decision making; fund saving rate; fuzzy analytic hierarchy process; general equipment maintenance material; human factor inclination; human factor slowness; human factor subjectivity; material procurement management; project time limit; qualified suppliers; quantitative model; security; Government; Indexes; Maintenance engineering; Materials; Procurement; Security; Standards; competitive procurement; maintenance materiel; procurement mode;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), 2013 International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4799-1014-4
  • Type

    conf

  • DOI
    10.1109/QR2MSE.2013.6625871
  • Filename
    6625871