DocumentCode
345478
Title
A 500 MeV-100 μA proton target for the ISAC radioactive ion beam facility
Author
Bricault, Pierre ; Dombsky, Marik ; Schmor, Paul ; Stanford, Guy ; Thorson, Ian ; Welz, Jaroslav
Author_Institution
TRIUMF, Vancouver, BC, Canada
Volume
1
fYear
1999
fDate
1999
Firstpage
100
Abstract
The construction phase of the ISAC radioactive ion beam (RIB) facility is now completed. The ISAC RIB facility utilizes the isotopic separation on line (ISOL) production method. The ISAC facility includes: a new building with 5000 m2 of floor space, a beam line with adequate shielding to transport up to 100 μA of proton at 500 MeV from the H* TRIUMF cyclotron to two target stations, remote handling facilities for the targets, a high resolution mass separator, a linear accelerator and experimental facilities. A novel approach for the target/ion source station is described. The target/ion source assembly and heavy ion optic components are located in a shield canyon under 2 m of steel shielding plug. A separator is to be coupled with either a low energy experimental area or to a linear accelerator for post-acceleration up to 1.5 A MeV
Keywords
cyclotrons; ion accelerators; ion optics; isotope separation; linear accelerators; nuclear bombardment targets; particle separators; radioactive ion beams; shielding; 100 muA; 500 MeV; ISAC RIB facility; ISAC radioactive ion beam facility; ISOL; TRIUMF cyclotron; beam line; heavy ion optic components; high resolution mass separator; isotopic separation on line; linear accelerator; proton target; remote handling facilities; shield canyon; shielding; steel shielding plug; Buildings; Floors; Ion beams; Ion sources; Linear accelerators; Particle beams; Particle separators; Production; Protons; Space stations;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1999. Proceedings of the 1999
Conference_Location
New York, NY
Print_ISBN
0-7803-5573-3
Type
conf
DOI
10.1109/PAC.1999.795635
Filename
795635
Link To Document