DocumentCode
3459848
Title
Incorporating health indices into a composite distribution network risk model to evaluate asset replacement major projects
Author
Blake, S.R. ; Taylor, P.C. ; Miller, D.C. ; Black, M.
Author_Institution
Durham Univ., Durham, UK
fYear
2011
fDate
22-24 Nov. 2011
Firstpage
1
Lastpage
6
Abstract
The use of condition based risk management (CBRM) to prioritise asset replacement on electrical distribution networks has become widespread, typically through the calculation of health indices for each asset. A separate methodology has also been developed for evaluating network risk on both simple and complex EHV networks. By combining this risk methodology with CBRM techniques, a composite model has been developed to predict the consequences of replacing, or of not replacing, individual assets or combinations of assets. This model can be used to inform the distribution network operator´s asset replacement decisions, enabling them to become more cost effective. The present paper describes the model, and applies it to regions of the actual distribution network in the North of England.
Keywords
condition monitoring; distribution networks; risk management; North of England; asset replacement major projects; complex EHV networks; composite distribution network risk model; condition based risk management; electrical distribution networks; health indices; simple EHV networks; Asset replacement; Condition based risk management (CBRM); Distribution Network Risk; Extra high voltage (EHV) networks; Health Indices;
fLanguage
English
Publisher
iet
Conference_Titel
Reliability of Transmission and Distribution Networks (RTDN 2011), IET Conference on
Conference_Location
London
Type
conf
DOI
10.1049/cp.2011.0519
Filename
6162261
Link To Document