• DocumentCode
    3459848
  • Title

    Incorporating health indices into a composite distribution network risk model to evaluate asset replacement major projects

  • Author

    Blake, S.R. ; Taylor, P.C. ; Miller, D.C. ; Black, M.

  • Author_Institution
    Durham Univ., Durham, UK
  • fYear
    2011
  • fDate
    22-24 Nov. 2011
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The use of condition based risk management (CBRM) to prioritise asset replacement on electrical distribution networks has become widespread, typically through the calculation of health indices for each asset. A separate methodology has also been developed for evaluating network risk on both simple and complex EHV networks. By combining this risk methodology with CBRM techniques, a composite model has been developed to predict the consequences of replacing, or of not replacing, individual assets or combinations of assets. This model can be used to inform the distribution network operator´s asset replacement decisions, enabling them to become more cost effective. The present paper describes the model, and applies it to regions of the actual distribution network in the North of England.
  • Keywords
    condition monitoring; distribution networks; risk management; North of England; asset replacement major projects; complex EHV networks; composite distribution network risk model; condition based risk management; electrical distribution networks; health indices; simple EHV networks; Asset replacement; Condition based risk management (CBRM); Distribution Network Risk; Extra high voltage (EHV) networks; Health Indices;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Reliability of Transmission and Distribution Networks (RTDN 2011), IET Conference on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/cp.2011.0519
  • Filename
    6162261