• DocumentCode
    3460887
  • Title

    Requirements management at NASA

  • Author

    Rosenburg, Linda

  • Author_Institution
    NASA Goddard Space Flight Center
  • fYear
    2001
  • fDate
    31-31 Aug. 2001
  • Firstpage
    275
  • Lastpage
    275
  • Abstract
    Summary form only given, as follows. Requirements have always been acknowledged as the backbone of any system. However, in many past development efforts, requirements were paid little heed. At NASA, in recent years, the hue and cry for project development has been "Faster, Better, Cheaper and Safer." This has impacted the way we develop software; it has increased the risks to quality, safety and reliability. At NASA, the Software Assurance Technology Center (SATC) is working with projects to emphasize the criticality of requirements throughout development, not just in the initial phases. This emphasis is on requirements relationship to all aspects of quality, including reliability and safety. In this presentation, we will look at some of these relationships through the eyes of quality.
  • Keywords
    Aerospace safety; Eyes; NASA; Software quality; Software reliability; Software safety; Space missions; Space technology; Spine; USA Councils;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Requirements Engineering, 2001. Proceedings. Fifth IEEE International Symposium on
  • Conference_Location
    Toronto, Ont., Canada
  • Print_ISBN
    0-7695-1125-2
  • Type

    conf

  • DOI
    10.1109/ISRE.2001.948579
  • Filename
    948579