DocumentCode
3468707
Title
Bid Evaluation Model Design for Construction Project Based on Fuzzy-TOPSIS
Author
Sun Wei-zhuo ; Liu Bing-sheng ; Lin Li
Author_Institution
Fac. of Constr. Manage. & Real Estate, Chongqing Univ., Chongqing, China
fYear
2010
fDate
7-9 Nov. 2010
Firstpage
1
Lastpage
4
Abstract
This paper analyzed the principles of TOPSIS, used the fuzzy set to pretreat the uncertainty factors in evaluation work. Then obtain the relative closeness according to the distance between each schemes and positive ideal solutions as well as negative ideal solutions. After that, we made comprehensive evaluation. At the end of this paper, a practical example is given to illustrate the effectiveness and feasibility of the proposed model.
Keywords
commerce; construction; fuzzy set theory; project management; bid evaluation model; construction project; fuzzy set; fuzzy-TOPSIS; uncertainty factors; Appraisal; Artificial neural networks; Decision making; Government; Indexes; Mathematical model; Schedules;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Product E-Service and E-Entertainment (ICEEE), 2010 International Conference on
Conference_Location
Henan
Print_ISBN
978-1-4244-7159-1
Type
conf
DOI
10.1109/ICEEE.2010.5660482
Filename
5660482
Link To Document