DocumentCode
3475675
Title
Optimization of internal electric connection system of large offshore wind farm with hybrid genetic and immune algorithm
Author
Li, Dong Dong ; He, Chao ; Fu, Yang
Author_Institution
Sch. of Power & Autom. Eng., Shanghai Univ. of Electr. Power, Shanghai
fYear
2008
fDate
6-9 April 2008
Firstpage
2476
Lastpage
2481
Abstract
This paper first presents development tendency and the importance of internal electric connection system of offshore wind farms. As internal electric connection system plays an important role in reliable operation of wind farm and holds considerable proportion in total investment, optimization of the system is one of the key problems in development of offshore wind farms. Based on analysis of main issues of the problem, optimization model is proposed and explained in this paper. An optimization approach based on hybrid genetic and immune algorithm is presented to search the optimal solution. The model and its solution method are then checked on a practical offshore wind farm near Shanghai, China. The results show that the optimization approach is suitable and valid.
Keywords
genetic algorithms; offshore installations; power generation reliability; wind power plants; China; hybrid genetic algorithm; immune algorithm; internal electric connection system; offshore wind farm reliability; optimization approach; Costs; Genetics; Helium; Power cables; Power generation; Power system reliability; Substations; Wind energy; Wind energy generation; Wind farms; Genetic algorithm; immune algorithm; internal electric connection system; offshore wind farm; optimization;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Utility Deregulation and Restructuring and Power Technologies, 2008. DRPT 2008. Third International Conference on
Conference_Location
Nanjuing
Print_ISBN
978-7-900714-13-8
Electronic_ISBN
978-7-900714-13-8
Type
conf
DOI
10.1109/DRPT.2008.4523827
Filename
4523827
Link To Document