• DocumentCode
    3485244
  • Title

    Safety case approach for the Victoria line re-signalling project

  • Author

    Storey, Jonathan

  • fYear
    2013
  • fDate
    20-20 March 2013
  • Firstpage
    1
  • Lastpage
    19
  • Abstract
    Presents a collection of slides covering the following topics: Victoria line resignalling; Public-Private Partnership; PPP; railway signalling overlay; automatic train control; railway functional requirements; railway safety requirement; reliability requirement; migration based assessment system; hazard management; risk assessment method; and legacy equipment.
  • Keywords
    hazards; overlay networks; public administration; rail traffic control; railway engineering; railway safety; reliability; risk analysis; signalling; PPP; Public-Private Partnership; Victoria line resignalling; automatic train control; legacy equipment; migration based assessment; railway functional requirements; railway safety requirement; railway signalling overlay; reliability requirement; risk assessment method; system hazard management;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Safety Assurance: Management and Method in a Safe Network, IET Seminar on
  • Conference_Location
    London
  • Electronic_ISBN
    978-1-84919-807-3
  • Type

    conf

  • DOI
    10.1049/ic.2013.0186
  • Filename
    6757183