• DocumentCode
    348734
  • Title

    On the fuzzy scheduling for flow shop jobs by using genetic algorithm

  • Author

    Okabe, Takao ; Maeda, Mikio ; Murakami, Shuta

  • Author_Institution
    Fac. of Eng., Kyushu Inst. of Technol., Kitakyushu, Japan
  • Volume
    4
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    528
  • Abstract
    Deals with fuzzy scheduling for flow shop jobs. In this scheduling problem, we employ a fuzzy penalty cost function for the delay time of the deadline of a job. The evaluation of job flow (ordering) is done by evaluating some penalty costs for the jobs. To select the best job flow, a genetic algorithm is used. However, under fuzzy evaluation, its solution is not unique and fuzzy valued. Finally, the fuzzy solutions as job flows are shown in a fuzzy Gantt chart
  • Keywords
    fuzzy set theory; genetic algorithms; production control; delay time; flow shop jobs; fuzzy Gantt chart; fuzzy penalty cost function; fuzzy scheduling; job flow; job ordering; Cost function; Delay effects; Equations; Genetic algorithms; Job shop scheduling; Manufacturing; Operations research; Processor scheduling; Production facilities;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1999. IEEE SMC '99 Conference Proceedings. 1999 IEEE International Conference on
  • Conference_Location
    Tokyo
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-5731-0
  • Type

    conf

  • DOI
    10.1109/ICSMC.1999.812459
  • Filename
    812459