DocumentCode
3512987
Title
An Algorithm for Scheduling a No-Wait Robotic Production System with Multi-Type Parts
Author
Che Ada ; Yan Pengyu ; Yang Naiding ; Chu Chengbin
Author_Institution
Sch. of Manage., Northwestern Polytech. Univ., Xi´an
fYear
2007
fDate
21-25 Sept. 2007
Firstpage
6023
Lastpage
6026
Abstract
An exact algorithm is proposed to solve a scheduling problem of a robotic production system in which multi-type parts are processed and parts are not allowed to wait on the machines. Finding an optimal schedule in such a production system is equivalent to finding two types of correlative sequences: parts input sequence and robot moves sequence. We show that the entering times of parts are the decision variables of the problem. We formulate our problem using the notion of prohibited intervals and solve it by enumerating intervals for linear functions of the decision variables, which is accomplished with a branch and bound procedure. Computational results on randomly generated test instances indicate that the algorithm is effective.
Keywords
industrial robots; scheduling; tree searching; branch and bound procedure; decision variables; exact algorithm; linear functions; multitype parts; no-wait robotic production system; optimal schedule; parts input sequence; robot moves sequence; scheduling problem; Computer aided manufacturing; Job shop scheduling; Materials handling; Optimal scheduling; Processor scheduling; Production systems; Productivity; Robotics and automation; Robots; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
Conference_Location
Shanghai
Print_ISBN
978-1-4244-1311-9
Type
conf
DOI
10.1109/WICOM.2007.1477
Filename
4341252
Link To Document