• DocumentCode
    3512987
  • Title

    An Algorithm for Scheduling a No-Wait Robotic Production System with Multi-Type Parts

  • Author

    Che Ada ; Yan Pengyu ; Yang Naiding ; Chu Chengbin

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xi´an
  • fYear
    2007
  • fDate
    21-25 Sept. 2007
  • Firstpage
    6023
  • Lastpage
    6026
  • Abstract
    An exact algorithm is proposed to solve a scheduling problem of a robotic production system in which multi-type parts are processed and parts are not allowed to wait on the machines. Finding an optimal schedule in such a production system is equivalent to finding two types of correlative sequences: parts input sequence and robot moves sequence. We show that the entering times of parts are the decision variables of the problem. We formulate our problem using the notion of prohibited intervals and solve it by enumerating intervals for linear functions of the decision variables, which is accomplished with a branch and bound procedure. Computational results on randomly generated test instances indicate that the algorithm is effective.
  • Keywords
    industrial robots; scheduling; tree searching; branch and bound procedure; decision variables; exact algorithm; linear functions; multitype parts; no-wait robotic production system; optimal schedule; parts input sequence; robot moves sequence; scheduling problem; Computer aided manufacturing; Job shop scheduling; Materials handling; Optimal scheduling; Processor scheduling; Production systems; Productivity; Robotics and automation; Robots; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2007. WiCom 2007. International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4244-1311-9
  • Type

    conf

  • DOI
    10.1109/WICOM.2007.1477
  • Filename
    4341252