• DocumentCode
    3521594
  • Title

    Simulation Model of Multi-Echelon Closed Supply Chain for Spare Parts

  • Author

    Qizhi Huang ; Bin Hu

  • Author_Institution
    Mil. Econ. Acad., Xiangfan, China
  • fYear
    2011
  • fDate
    28-29 May 2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The models for spare parts supply in existing literatures predominantly address analytical models. The dominant model in practical applications is the METRIC, which has been extensively used even nowadays although it understates the backorders at the base and consequently overstates system availability. However, even the most recent models have restrictions to their successful application. To surpass some of the limitations of those models we develop a simulation model to manage the spare parts in a multi-echelon closed supply chain system in this paper, and evaluate the system performance with expect backorder and supply availability. Experiments show the model works well and efficiently.
  • Keywords
    maintenance engineering; supply chains; METRIC; expect backorder; multiechelon closed supply chain; overstates system availability; simulation model; spare parts; supply availability; Analytical models; Availability; Computational modeling; Maintenance engineering; Mathematical model; Measurement; Supply chains;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Systems and Applications (ISA), 2011 3rd International Workshop on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-9855-0
  • Electronic_ISBN
    978-1-4244-9857-4
  • Type

    conf

  • DOI
    10.1109/ISA.2011.5873402
  • Filename
    5873402