DocumentCode
3528732
Title
Study on construction supply chain cost management based on lean thinking
Author
Chen, Yan ; Xu, Zhan-gong
Author_Institution
Sch. of Manage., Qingdao Technol. Univ., Qingdao, China
Volume
Part 3
fYear
2011
fDate
3-5 Sept. 2011
Firstpage
1530
Lastpage
1533
Abstract
Currently, cost management is playing an import role in building the overall competence of construction supply chain (CSC). In order to solve the major problems of cost management in our CSC, we propose that lean thinking be applied to CSC cost management so as to improve cost competence of our CSC by eliminating all forms of non-value added activities and wastes across the entire supply chain. This paper first analyzes the major problems of our CSC cost management. Then it introduces the idea and characteristics of lean CSC cost management. Finally, it elaborates four main aspects of implementing lean CSC cost management, including lean procurement cost management, lean design cost management, lean construction cost management and lean service cost management.
Keywords
construction industry; cost accounting; procurement; supply chains; construction supply chain; cost management; lean construction; lean design; lean procurement; lean service; lean thinking; Companies; Decision making; Educational institutions; Materials; Monitoring; Procurement; Supply chains; lean CSC cost management; lean construction cost management; lean design cost managemnt; lean procurement cost management; lean thinking;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-61284-446-6
Type
conf
DOI
10.1109/ICIEEM.2011.6035450
Filename
6035450
Link To Document