DocumentCode
3539958
Title
Progress of stochastic analysis of waterhammer and surge in pumped storage plant
Author
Jian, Yuan ; Jin, Shu ; Dong, Liu
Author_Institution
Water C.onservancy & Hydropower Eng. Coll., Hohai Univ., Nanjing, China
fYear
2012
fDate
14-15 Aug. 2012
Firstpage
58
Lastpage
61
Abstract
Change of waterhammer and surge with time is considered as a stochastic process. Then the purpose, present status and progress of stochastic analysis of waterhammer and surge in pumped storage plant are summarized. Stochastic analysis methods are introduced, including modeling and solving. Finally, some suggestions are presented for stochastic analysis.
Keywords
design engineering; flow; power plants; pumps; reliability; stochastic processes; surges; modeling method; pumped storage plant; solving method; stochastic analysis method; stochastic process; surge; waterhammer; Analytical models; Differential equations; Mathematical model; Probability distribution; Reliability; Stochastic processes; Surges; pumped storage plant; review; stochastic analysis; surge; waterhammer;
fLanguage
English
Publisher
ieee
Conference_Titel
Uncertainty Reasoning and Knowledge Engineering (URKE), 2012 2nd International Conference on
Conference_Location
Jalarta
Print_ISBN
978-1-4673-1459-6
Type
conf
DOI
10.1109/URKE.2012.6319583
Filename
6319583
Link To Document