• DocumentCode
    3566500
  • Title

    Lower and upper bounds for single machine problem with sequence dependent setup to minimize maximum tardiness

  • Author

    LUO, Xiaochuan ; WANG, Chengen ; Liu, Zhen ; Qu, Rongxia ; Shu, Qilin

  • Author_Institution
    Key Lab. of Process Ind. Autom., Northeastern Univ., Shenyang, China
  • Volume
    1
  • fYear
    2005
  • Firstpage
    375
  • Abstract
    Tardiness is an important measure for customer satisfaction. This paper addresses the lower and upper bounds for the problem of scheduling N jobs on a single machine with due dates, sequence dependent setup times and no preemption where the objective is to minimize the maximum tardiness. Computational experiments demonstrate the effectiveness of the lower and upper bounds.
  • Keywords
    customer satisfaction; job shop scheduling; minimisation; single machine scheduling; customer satisfaction; job scheduling; maximum tardiness minimization; sequence dependent setup time; single machine scheduling problem; Costs; Customer satisfaction; Job shop scheduling; Laboratories; Manufacturing industries; Manufacturing systems; Processor scheduling; Production systems; Single machine scheduling; Upper bound;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Services Systems and Services Management, 2005. Proceedings of ICSSSM '05. 2005 International Conference on
  • Print_ISBN
    0-7803-8971-9
  • Type

    conf

  • DOI
    10.1109/ICSSSM.2005.1499498
  • Filename
    1499498