• DocumentCode
    357861
  • Title

    EMC management: an integral part of a company´s quality program

  • Author

    Sin, R. ; Majewski, Daniel J.

  • Author_Institution
    Siemens Building Technol. Inc., Buffalo Grove, IL, USA
  • Volume
    1
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    285
  • Abstract
    It is widely agreed that each electronic hardware product should be found to meet a minimum level of robustness prior to being released for production. To that end, a minimum set of hardware tests along with detailed pass/fail criteria should be employed to verify a product´s robustness prior to its release and sale. EMC testing should be viewed not only as a regulatory requirement, but as an integral part of this essential test program as well. This paper details how one company has implemented a standard hardware suite of tests whereby EMC and EMI testing are essential parts of determining if a product is ready to meet the demands that its manufacturing partners, its field organization, and ultimately its customers, place upon it
  • Keywords
    conformance testing; electromagnetic compatibility; electromagnetic interference; electronic equipment testing; quality management; EMC management; EMC testing; EMI testing; company quality program; customers; electronic hardware product; field organization; hardware quality assurance; manufacturing partners; pass/fail criteria; regulatory requirement; standard hardware tests suite; test program; Electromagnetic compatibility; Electromagnetic interference; Hardware; Marketing and sales; Production; Pulp manufacturing; Quality management; Robustness; Standards organizations; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electromagnetic Compatibility, 2000. IEEE International Symposium on
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-5677-2
  • Type

    conf

  • DOI
    10.1109/ISEMC.2000.875579
  • Filename
    875579