Load-out operation of South Pars Gas Field-phase 1 production platform in the Persian Gulf
Author
Hosseini, Mohammad Khalaj Amir
Author_Institution
Eng. Dept., Iran Marine Ind. Co., Tehran, Iran
Volume
2
fYear
2003
Firstpage
873
Abstract
The load-out operation of the SPP1 production platform is reviewed. The main items discussed are mooring, push/pull and ballasting systems. Mooring system is used for aligning the skid beams of the barge and skid beams of the heavy platform area. The required tension of the wire ropes is determined, based on the information about speed of tidal current and also wind. The push/pull system is used to pull the heavy platform from the yard to the "SADRA FLB-124" work barge. Because of limitations on minimum breaking load of the wire ropes and also load capacity of the bollards, pulling cylinders must be located on the barge. PLC based ballasting system is used to keep the barge horizontal and also in an appropriate level. The main effects that have been considered in the modeling of the load-out operation, are load movement and also tide. The main computer software was developed using MATLAB 5.3.1 R11, but it was translated to C/sup ++/ language for better calculation speed and more compatibility.
Keywords
offshore installations; C/sup ++/ language; MATLAB; PLC based ballasting system; Persian Gulf; SADRA FLB-124 work barge; SPP1 production platform; South Pars Gas Field; bollard; computer software; load-out operation; mooring system; phase 1 production platform; pulling cylinder; push/pull system; skid beam aligning; tidal current speed; wind; wire rope tension; Boats; Electronic ballasts; Load modeling; MATLAB; Mathematical model; Production; Programmable control; Software; Tides; Wire;
fLanguage
English
Publisher
ieee
Conference_Titel
OCEANS 2003. Proceedings
Print_ISBN
0-933957-30-0
Type
conf
DOI
10.1109/OCEANS.2003.178439
Filename
1283398
Link To Document