• DocumentCode
    3621615
  • Title

    An algorithm for reactive batch sequencing

  • Author

    V. Jovan;B. Hauptman

  • Author_Institution
    Dept. of Syst. & Control, Jozef Stefan Inst., Ljubljana, Slovenia
  • Volume
    2
  • fYear
    2005
  • fDate
    6/27/1905 12:00:00 AM
  • Lastpage
    840
  • Abstract
    The specifics of process manufacturing have a great influence on a production management and the focus of production scheduling is to maintain stable production within given constraints. The paper presents a dedicated online algorithm that has been developed with the intention of predicting the adequate starting time for a single new batch in a system consisting of two chemical reactors sharing a common discharge vessel. The validation of the achieved results, derived from the algorithm testing, shows that the proposed algorithm can significantly contribute to more stable production and can efficiently deal with the no-wait constraints and the non-uniformity of batch durations of the real case study process
  • Keywords
    "Job shop scheduling","Manufacturing industries","Scheduling algorithm","Manufacturing processes","Production management","Batch production systems","Testing","Uncertainty","Algorithm design and analysis","Control systems"
  • Publisher
    ieee
  • Conference_Titel
    Emerging Technologies and Factory Automation, 2005. ETFA 2005. 10th IEEE Conference on
  • Print_ISBN
    0-7803-9401-1
  • Type

    conf

  • DOI
    10.1109/ETFA.2005.1612760
  • Filename
    1612760