    Analysis of Duration and Cost Estimate of Construction Projects Through Computer Simulation

  • Author

    Darko Dukic;Tamara Maric;Dubravka Babic

  • Author_Institution
    ABACUS Tuition, Research and Business Consultancy, Mosorska 8, Osijek, Croatia. darko.dukic@os.t-com.hr
  • fYear
    2007
  • fDate
    6/1/2007 12:00:00 AM
  • Firstpage
    107
  • Lastpage
    112
  • Abstract
    Computer simulation has found its place in the field of construction project management as well. Its usage in solving the scheduling problem can significantly enhance the project manager´s decision-making, especially in today´s complex operating conditions. The model of analysis of duration and cost estimate of construction projects, as presented in this paper, is based on a computer simulation. The theoretical framework for generating random numbers has been laid down by the triangular distribution. A key role in the model is played by statistical analysis whose usage ultimately results in establishing an appropriate confidence interval for the mean project duration.
  • Keywords
    "Costs","Computer simulation","Job shop scheduling","Project management","Processor scheduling","Phase estimation","Statistical analysis","Computational modeling","Decision making","Government"
  • Publisher
    ieee
  • Conference_Titel
    Information Technology Interfaces, 2007. ITI 2007. 29th International Conference on
  • ISSN
    1330-1012
  • Print_ISBN
    953-7138-09-7
  • Type

    conf

  • DOI
    10.1109/ITI.2007.4283753
  • Filename
    4283753