• DocumentCode
    3639622
  • Title

    Matching production planning and ship arrival scheduling by simulation

  • Author

    Marcelo Moretti Fioroni;Sydney Santos Cordeiro;Luiz Augusto G. Franzese;Luiz Francisco da Silva;Caio Eduardo Zanin;Vítor Luciano de Almeida Benevides;José Alexandre Sereno Quintáns;Lúcia Dini Pereira;Isac Reis de Santana;Paulo

  • Author_Institution
    Paragon Tecnologia, Rua Clodomiro Amazonas, 1435, 5th floor, 04537-012 Sã
  • fYear
    2010
  • Firstpage
    1990
  • Lastpage
    1997
  • Abstract
    There are several challenges involving the representation of an ore loading port system using a simulation package. This kind of port handles bulk material, much more adequately represented by continuous flow than discrete flow, as in opposite to the case of a container-handling port. This paper addresses specifically the impact of meeting product mix requirements in the delivery and the ship arrival schedules. A method to model this feature is presented. Also, the modeling approach of these aspects is presented, and the experimentation in the case of Porto do Açu, located at Rio de Janeiro, is performed to check the method´s efficiency.
  • Keywords
    "Marine vehicles","Materials","Delay","Load modeling","Production planning","Loading"
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), Proceedings of the 2010 Winter
  • ISSN
    0891-7736
  • Print_ISBN
    978-1-4244-9866-6
  • Electronic_ISBN
    1558-4305
  • Type

    conf

  • DOI
    10.1109/WSC.2010.5678874
  • Filename
    5678874