DocumentCode
3658248
Title
Project ranking using partial ranks
Author
Jiali Ju;Pei Zhang;Timothy Anderson
Author_Institution
Department of Engineering and Technology Management, Portland State University, OR - USA
fYear
2015
Firstpage
472
Lastpage
477
Abstract
A competition was recently held for new elder care technologies and a method was needed for selecting an audience favorite project. Since each of the eight projects received a half hour presentation time slot spread out over a full day, attendance varied significantly with morning projects having a much lower attendance. An algorithm was desired that was robust with respect to varying evaluator. A new algorithm for aggregating ranks from a large number of incomplete judgment was developed and applied to the projects to select a winner. This paper presents the new algorithm, tests the new approach against others in the application, and discusses relative tradeoffs.
Keywords
"Algorithm design and analysis","Nominations and elections","Focusing","Bibliographies","Companies","Indexes","Robustness"
Publisher
ieee
Conference_Titel
Management of Engineering and Technology (PICMET), 2015 Portland International Conference on
Type
conf
DOI
10.1109/PICMET.2015.7273155
Filename
7273155
Link To Document