DocumentCode
3665123
Title
Worker assignment optimization under reset limited-cycled model with multiple periods — Focus on worker´s clever tasks
Author
Xianda Kong;Hisashi Yamamoto;Shiro Masuda
Author_Institution
Dept. of System Design, Tokyo Metropolitan University, 6-6, Asahigaoka, Hino, Tokyo, Japan, 191-0065
fYear
2015
fDate
7/1/2015 12:00:00 AM
Firstpage
1017
Lastpage
1022
Abstract
In uncertain cases, the result and efficiency of current period (or production cycle) are influenced not only by the risks which exist in current period but also by the risks which exist in the previous ones. What is more, the risk itself is also affected greatly by the risks which exist in the earlier periods. This kind of problem is called a limited-cycle problem with multiple periods. Normally, workers´ efficiency is different on different tasks. How can we get an optimal assignment to minimize the total expected costs? In this paper, we consider the optimal worker assignment considering two kinds of efficiency, clever or poor efficiency on tasks. The regularity will be described that n-2 workers have two clever tasks of all, 2 worker has no clever task by contrast. Also, some numerical experiments will be done to check out the regularity of the optimal assignment that each worker has three clever tasks.
Keywords
"Production","Delays","Numerical models","Sun","Manufacturing","Industrial engineering","Optimization"
Publisher
ieee
Conference_Titel
Society of Instrument and Control Engineers of Japan (SICE), 2015 54th Annual Conference of the
Type
conf
DOI
10.1109/SICE.2015.7285558
Filename
7285558
Link To Document