DocumentCode
3686695
Title
Constructive heuristics for technology-driven Resource Constrained Scheduling Problem
Author
Paweł B. Myszkowski;Michał Przewoźniczek;Marek Skowroński
Author_Institution
Wrocł
fYear
2015
Firstpage
119
Lastpage
127
Abstract
In this paper, we define a new practical technology-driven Resource Constrained Scheduling Problem (t-RCPSP). We propose three approaches, applying constructive heuristics to tackle effectively the practical application of RCPSP. In the RCPSP formulation, the constraints are defined to design the tasks in the spaces constructed by non- and renewable resources, without violating the precedence relationships and technologies in real world problem that exists in Plastic and Rubber Processing company. The difficulty of t-RCPSP is NP-hard and we proposed three constructive specialized methods: duration based heuristics (DBH), locally optimal resource usage PEC and NEH heuristic adaptation. The paper presents results of computational experiments that show the effectiveness of the proposed approaches.
Keywords
"Schedules","Processor scheduling","Job shop scheduling","Companies","Electronic mail"
Publisher
ieee
Conference_Titel
Computer Science and Information Systems (FedCSIS), 2015 Federated Conference on
Type
conf
DOI
10.15439/2015F389
Filename
7321433
Link To Document