DocumentCode
3711544
Title
Planning and designing of distributed PV of Suzhou Industrial Park
Author
Tao Li; Wenjing Wang
Author_Institution
The Key Laboratory of Solar Thermal Energy and Photovoltaic System, Institute of Electrical Engineering, CAS, Beijing 100190, China
fYear
2015
fDate
6/1/2015 12:00:00 AM
Firstpage
1
Lastpage
2
Abstract
In this paper, planning and designing of distributed PV of Suzhou Industrial Park are discussed, including financing mode, operation mode and profit mode. Domestic subsidies case is described detailed. The total installed capacity of the roof and the total generating capacity situation are shown and internal rate of return and payback period of five cases are calculated, proving the local development of distributed PV systems can be profitable. Suzhou Industrial Park plans to install distributed PV of 1232.8MW and about 249.09 hundred million yuan of GDP could be created.
Keywords
"Computer aided software engineering","Power generation"
Publisher
ieee
Conference_Titel
Photovoltaic Specialist Conference (PVSC), 2015 IEEE 42nd
Type
conf
DOI
10.1109/PVSC.2015.7356266
Filename
7356266
Link To Document