• DocumentCode
    3720627
  • Title

    EMC design and management and grounding practice of field communication equipment

  • Author

    Xu-Guang Wan;Fan Liu

  • Author_Institution
    PLA University of Science and Technology, Nanjing Jiangsu 210007, China
  • fYear
    2015
  • Firstpage
    143
  • Lastpage
    147
  • Abstract
    Field communication equipments have taken the EMC(electromagnetic compatibility) test before they were settled , but during the process of using by the soldiers of the troops, equipments were always influenced by the radiation of other types of them in the same allocate district, or influenced by the changing radiant situation in different stages of using. All these reasons make the equipments of the same communication center interrupt each other and reduce the communicate efficiency. Combined with the author´s working experience, from the EMC management, design, and the experience of verification, this paper is put forward to the work flow and the implementation steps that ensure better EMC performance, and summed up an effective way to improve the EMC of a type of communication equipments by cabinet grounding.
  • Keywords
    "Electromagnetic compatibility","Wide area networks","Jamming","Computers","Interference","Communication cables"
  • Publisher
    ieee
  • Conference_Titel
    Environmental Electromagnetics (CEEM), 2015 7th Asia-Pacific Conference on
  • Print_ISBN
    978-1-4673-9444-4
  • Type

    conf

  • DOI
    10.1109/CEEM.2015.7368650
  • Filename
    7368650