• DocumentCode
    3721441
  • Title

    Integrated scheduling in ready mixed concrete plant with multi-mixer

  • Author

    Yakun Zhang; Hua Guo

  • Author_Institution
    School of Automation, Huazhong University of Science and Technology, Wuhan, China
  • fYear
    2015
  • fDate
    7/1/2015 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    In this study, an integrated programming model in ready mixed concrete plant with multi-mixer is developed, which is based on the research of a real company´s business process and logistics management. A method is proposed which applies a combining-rules algorithm including the rules for choosing mixers, trucks and construction sites. On the basis of computational experiments on a variety of real cases, some conclusions are drawn which can provide a better solution for a scheduling manager.
  • Keywords
    "Mixers","Concrete","Scheduling","Loading","Vehicles","Scheduling algorithms"
  • Publisher
    ieee
  • Conference_Titel
    Logistics, Informatics and Service Sciences (LISS), 2015 International Conference on
  • Type

    conf

  • DOI
    10.1109/LISS.2015.7369721
  • Filename
    7369721