DocumentCode
3728859
Title
Efficient constructive procedures for the distributed blocking flow shop scheduling problem
Author
Ramon Companys;Imma Ribas
Author_Institution
Departament d´Organitzaci? d´Empreses. Universitat Polit?cnica de Catalunya, BarcelonaTech, Spain
fYear
2015
Firstpage
92
Lastpage
98
Abstract
The distributed blocking flow shop scheduling problem (DBFSP) allows modeling of the scheduling process in companies with more than one factory, with productive systems configured as flow shop lines where the blocking constraint has to be considered. To the best of our knowledge, this variant of the distributed permutation flow shop scheduling problem has not been studied. In this paper, we propose some constructive heuristics that will solve the DBFSP and thus minimize the maximum completion time among the factories. The proposed procedures use two approaches that are totally different from those proposed for the distributed permutation flow shop scheduling problem (DPFSP). By taking the DPFSP procedures that we adapted to DBFSP and comparing them to the new approaches that were specifically designed for DBPFSP, we find that the latter perform considerably better.
Keywords
"Production facilities","Job shop scheduling","Resource management","Sequential analysis","Indexes","Calibration"
Publisher
ieee
Conference_Titel
Industrial Engineering and Systems Management (IESM), 2015 International Conference on
Type
conf
DOI
10.1109/IESM.2015.7380142
Filename
7380142
Link To Document