• DocumentCode
    3728919
  • Title

    A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine

  • Author

    Ahmed Gara-Ali;Marie-Laure Espinouse

  • Author_Institution
    G-SCOP, Univ. Grenoble Alpes, Grenoble, France
  • fYear
    2015
  • Firstpage
    481
  • Lastpage
    488
  • Abstract
    Simultaneously scheduling jobs and preventive maintenance is a topical subject in the scheduling literature. In this paper, we study a two-machine flow-shop makespan scheduling problem with a deteriorating maintenance period on the second machine, that is, delaying the maintenance increases the time required to perform it. We show that the studied problem is NP-hard and we establish some conditions of the optimal schedule. We also develop a branch and bound (B&B) algorithm to solve this problem. Numerical experiments show that the B&B method can solve large-size instances.
  • Keywords
    "Optimal scheduling","Schedules","Job shop scheduling","Upper bound","Preventive maintenance"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Systems Management (IESM), 2015 International Conference on
  • Type

    conf

  • DOI
    10.1109/IESM.2015.7380202
  • Filename
    7380202