• DocumentCode
    3732941
  • Title

    Research on single-level lot-sizing problem under the time-varying environment

  • Author

    Jie Zhang;Jianrui Dong;Yiyong Xiao

  • Author_Institution
    School of Reliability and Systems Engineering, Beihang University, Beijing, China
  • fYear
    2015
  • Firstpage
    489
  • Lastpage
    493
  • Abstract
    Lot-sizing problem is one of the most important issues in the production planning area and a large number of related research works can be found in literature. However, most of the works only consider the problem in a steady environment, without taking into account the time-varying production conditions that may change timely in some industrial applications. In this paper, we present the time-varying single-level lot-sizing (TV-SLLS) problem and describe it with a mathematical programming model. New properties of this problem has been analyzed, and several theorems have been developed. We propose a dynamic programming algorithm as an exact solution approach for the TV-SLLS. Problem examples and numerical calculation have been provided to evaluate the solution approach and the optimality.
  • Keywords
    "Heuristic algorithms","Delays","Dynamic programming","Planning","Industries","Production planning"
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on
  • Type

    conf

  • DOI
    10.1109/IEEM.2015.7385695
  • Filename
    7385695