• DocumentCode
    3736959
  • Title

    Countdown graph: Estimating completion of testing

  • Author

    Pete Rotella;Tom Land;Marjan Moshref;Sunita Chulani

  • Author_Institution
    Cisco Systems, Inc.
  • fYear
    2015
  • Firstpage
    1
  • Lastpage
    1
  • Abstract
    The Universal Release Criteria (URC) Model has been used at Cisco for the past two years to assist test teams management in determining when adequate function testing, system testing, and bug fixing is achieved for a new release. A key URC metric is called Incoming Defect Level (IDL) - this is the percentage of the cumulative incoming bugs growth curve achieved at any week during testing. We use a Goel Okumoto Shaped (GOS) curve for fitting the cumulative incoming bug level, and focus, near the end of testing, on the top-end, exponentially decaying part of the curve that gradually approaches an asymptote. At 80% of the asymptote level, that is, where IDL equals 80%, we have empirically determined that the release will likely achieve best-in-class reliability in the field. This level is found to be appropriate for all products and releases studied so far - approximately 180 releases for 70 products.
  • Keywords
    "Computer bugs","Reliability","Industries","System testing","Measurement","Fitting"
  • Publisher
    ieee
  • Conference_Titel
    Software Reliability Engineering Workshops (ISSREW), 2015 IEEE International Symposium on
  • Type

    conf

  • DOI
    10.1109/ISSREW.2015.7392023
  • Filename
    7392023