• DocumentCode
    3762690
  • Title

    Interconnection of hydro power plant through 20 kV distributed line to improve electrical power supply in Dieng Central Java

  • Author

    Mochammad Facta; Hermawan

  • Author_Institution
    Electrical Engineering Dept., Universitas Diponegoro, Semarang - Indonesia
  • fYear
    2015
  • Firstpage
    363
  • Lastpage
    366
  • Abstract
    Hydro power plant is possible to be present and has interconnection to distribution line. The presence of such power plant is expected to supply additional power and overcome voltage drop at load side. In this paper, several experimental works based on simulation and primary data from field measurement are presented to show the performance of interconnection of hydro power plant through 20 kV distribution line to improve electrical power supply in Dieng - Central Java. Several requirements were observe and investigated by conducting simulation experiment. Several analyses such as Load flow, short circuit and stability were performed. As the results, the presence of hydro power plant has given positive impact to the profile of voltage in 20 kV distribution system. All power flows to the load properly and no reverse power back to the power plant or substation.
  • Keywords
    "Integrated circuit interconnections","Voltage measurement","Substations","Electric potential","Power measurement","TV","Relays"
  • Publisher
    ieee
  • Conference_Titel
    Information Technology, Computer, and Electrical Engineering (ICITACEE), 2015 2nd International Conference on
  • Print_ISBN
    978-1-4799-9861-6
  • Type

    conf

  • DOI
    10.1109/ICITACEE.2015.7437830
  • Filename
    7437830