• DocumentCode
    3780329
  • Title

    Real power rescheduling for congestion management with integration of wind farm using firefly algorithm

  • Author

    Subhasish Deb;Sadhan Gope;Arup Kumar Goswami

  • Author_Institution
    Department of Electrical Engineering, Mizoram University, Aizawl, India-796004
  • fYear
    2015
  • fDate
    6/1/2015 12:00:00 AM
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    Deregulation of power system brought huge competition among the sellers and buyers of electricity market where all the parties try to gain their profit, hence it is quite important for grid or independent system operator (ISO) to maintain smooth flow of electric power without violating its security level and satisfies customers with reasonable cost. Power system transmission congestion occurs due to the violation of its thermal limit. In this paper, along with generator rescheduling technique renewable energy source like wind farm has been introduced as a congestion management problem solver. Bus sensitivity factor (BSF) has been introduced here to find out optimal location of wind farm whereas generator sensitivity factor (GSF) determines the number of participating generators for rescheduling their output. At last optimization technique like Firefly Algorithm (FA) has been adopted for generator rescheduling process along with wind firm. This method is applied in IEEE 39 bus New England Test System.
  • Keywords
    "Generators","Wind farms","Sensitivity","Power system stability","Load flow","Wind power generation","Power transmission lines"
  • Publisher
    ieee
  • Conference_Titel
    Energy, Power and Environment: Towards Sustainable Growth (ICEPE), 2015 International Conference on
  • Type

    conf

  • DOI
    10.1109/EPETSG.2015.7510152
  • Filename
    7510152