• DocumentCode
    384760
  • Title

    New planning procedures and countermeasures against problems after restructuring in Korea

  • Author

    Park, D.-W. ; Rhee, Ch -H ; Lee, K.D.

  • Author_Institution
    Electr. Ind. Policy Res. Group, Electrotechnol. Res. Inst., South Korea
  • Volume
    1
  • fYear
    2002
  • fDate
    13-17 Oct 2002
  • Firstpage
    36
  • Abstract
    This paper deals with new planing procedures of power systems after restructuring in Korea. Contents and procedure planing are shown. Counter-measures for demand/supply balance are discussed. Transmission network planing after restructuring is analysed. The directions that will be moved towards in making resource planning together with transmission network planning are suggested.
  • Keywords
    electricity supply industry deregulation; power transmission planning; Korea; demand/supply balance; power industry restructuring; power system planning procedures; resource planning; transmission network planning; Capacity planning; Electricity supply industry; Energy management; Information analysis; Law; Legal factors; Planing; Power generation; Power system planning; Resource management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power System Technology, 2002. Proceedings. PowerCon 2002. International Conference on
  • Print_ISBN
    0-7803-7459-2
  • Type

    conf

  • DOI
    10.1109/ICPST.2002.1053500
  • Filename
    1053500