Ranking and postponement of investments in planning the Serbian electric power networks
Author
S. Jovanovic;S. Mrdja;M. Lauby
Author_Institution
Nikola Tesla Inst., Belgrade, Yugoslavia
Volume
137
Issue
5
fYear
1990
Firstpage
321
Lastpage
326
Abstract
A method for ranking and postponing investments during the planning of electrical power networks is presented. The probabilistic economic criterion which takes into consideration the cost of expected undelivered energy is used to derive a profitability index, a postponement index and combined technical-economical-probabilistic planning criteria. The method allows the ranking and the postponement of technically justified but economically unjustified investments which is especially useful when insufficient investment funds are available for construction.
Keywords
"Power system planning","Power transmission"
Journal_Title
IEE Proceedings C - Generation, Transmission and Distribution
Publisher
iet
ISSN
0143-7046
Type
jour
DOI
10.1049/ip-c.1990.0043
Filename
58805
Link To Document