• DocumentCode
    389435
  • Title

    Multi-agent approach for planning and scheduling of integrated steel processes

  • Author

    Gao, Huimin ; Zeng, Jianchao ; Sun, Guoji

  • Author_Institution
    Inst. of Syst. Eng., Xi´´an Jiaotong Univ., China
  • Volume
    6
  • fYear
    2002
  • fDate
    6-9 Oct. 2002
  • Abstract
    In this paper, we proposed a multi-agent system for planning and scheduling of the integrated steel processes, which is an extremely complex task requiring the consideration of numerous constraints and objectives. The system is implemented using the agent based Asynchronous Team (A-Team) architecture in which multiple solution methods cooperate by evolving shared population of solution. Each process in the integrated production environment is assigned to an agent, which performs, independently its scheduling at a local level by using its sub-agent: construction agents, improvement agents and destruction agents.
  • Keywords
    multi-agent systems; process control; production control; steel manufacture; agent based asynchronous team architecture; construction agents; destruction agents; improvement agents; integrated steel processes scheduling; multi-agent approach; multi-agent system; Casting; Heuristic algorithms; Iron; Job shop scheduling; Process planning; Production planning; Scheduling algorithm; Shape; Solids; Steel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 2002 IEEE International Conference on
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-7437-1
  • Type

    conf

  • DOI
    10.1109/ICSMC.2002.1175626
  • Filename
    1175626