DocumentCode
409120
Title
The technical realisation of RF kickers for CLIC Test Facility CTF3
Author
Plawski, E. ; Kulinski, S. ; Kucharczyk, A.
Author_Institution
Inst. for Nucl. Studies, Swierk, Poland
Volume
4
fYear
2003
fDate
12-16 May 2003
Firstpage
2787
Abstract
The bunch train compression scheme in CLIC Test Facility CTF3 includes two fast RF kickers operating in deflecting mode on 3 GHz frequency. The kickers designed by common INFN-Frascati/INS-Swierk effort were produced in Institute for Nuclear Studies in Swierk and are successfully operated at full power in CTF3 experiment in CERN. The details of fabrication procedure and low power RF measurements are presented in this paper.
Keywords
accelerator RF systems; beam handling techniques; electron accelerators; linear colliders; particle beam bunching; CLIC Test Facility; CTF3 experiment; bunch train compression scheme; deflecting mode; fabrication procedure; fast RF kicker; low power RF measurement; Aluminum; Antenna measurements; Copper; Fabrication; Frequency measurement; Hydrogen; Machining; Radio frequency; Soldering; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1289268
Filename
1289268
Link To Document