DocumentCode
420005
Title
Technology and construction works for OPGW installation in alive-line transmission line
Author
Nishimura, Fumitaka ; Soares, Maurício R. ; Lacerda, Lenildo ; Warvick, F. ; Hashimoto, Akihide ; Mito, Masataka ; Cicarelli, Liliane D. ; Chavez, J.A. ; Sato, Ulio T.
Author_Institution
PROCABLE, Brazil
Volume
2
fYear
2003
fDate
7-12 Sept. 2003
Firstpage
579
Abstract
Due to the increase of OPGW cable use in Brazil and considering the restrictions of the Brazilian National Operation System to disconnect the overhead transmission lines, manufacturers and utilities have developed technologies and construction works to remove the conventional existent ground wires replacing them by OPGW cables, with energized line. One of the fastest and safest alive line installation technology, particularly for 500 kV lines, is the "carrier method" developed by Fujikura Ltd. The method consists by using a self-propelled carrier, special aramide ropes and double pulleys and the average productivity of cable installation is 60 km/month per team. This paper describes the method, the tools, the training of construction teams for OPGW installation in alive-lines. The "carrier method" was successfully used in Brazil in the CHESF transmission line system, and about 300 km of OPGW cable using this method were installed.
Keywords
power cables; power overhead lines; 500 kV; OPGW cable installation; alive-line transmission line; carrier method; hot-line construction works; line ground wires; line installation technology; overhead transmission lines; Circuits; IEEE members; Manufacturing; Optical fiber cables; Optical fiber networks; Power cables; Power overhead lines; Power transmission lines; Transmission lines; Wire;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference and Exposition, 2003 IEEE PES
Print_ISBN
0-7803-8110-6
Type
conf
DOI
10.1109/TDC.2003.1335339
Filename
1335339
Link To Document