Chance constrained project scheduling under risk
Author
Zafra-Cabeza, Ascensión ; Ridao, Miguel A. ; Camacho, Eduardo E.
Author_Institution
Departamento de Ingenieria de Sistemas y Autom., Seville Univ., Spain
Volume
2
fYear
2004
fDate
10-13 Oct. 2004
Firstpage
1789
Abstract
This study uses a p-timed Petri net to represent the initial scheduling of a project: places are tasks and each place has assigned a initial cost and a initial time execution. Risk management is applied to project scheduling in order to identify and mitigate risks where uncertain variables are modelled as stochastic variables. The algorithm determines the set of mitigation actions that reduce the risk exposure stated in the chance constraints of the proposed optimization problem. This work shows how this problem can be modelled as a stochastic optimization problem requiring that constraints should be held with a probability exceeding α.
Keywords
Petri nets; optimisation; project management; risk management; scheduling; stochastic processes; initial time execution; p-timed Petri net; project scheduling; risk management; stochastic optimization; stochastic variable; Constraint optimization; Contingency management; Costs; Disaster management; Petri nets; Programmable control; Project management; Risk management; Scheduling; Stochastic processes;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems, Man and Cybernetics, 2004 IEEE International Conference on
ISSN
1062-922X
Print_ISBN
0-7803-8566-7
Type
conf
DOI
10.1109/ICSMC.2004.1399903
Filename
1399903
Link To Document