• DocumentCode
    455510
  • Title

    An Assessor´s View of Human Factors and Managing a Culture Change

  • Author

    Sheppard, Peter

  • fYear
    2006
  • fDate
    5-9 June 2006
  • Firstpage
    266
  • Lastpage
    282
  • Abstract
    The paper describes a signalling project that brought about a significant culture change to a large number of stakeholders. What is most interesting is that the need for this culture change came about as a result of simply changing the method of train detection. It also discusses the involvement that human factors had on the project and in particular how it contributed to the arguments within the safety case. This will all be in the context of the role as Lead Independent Safety Assessor for the project.
  • Keywords
    cultural aspects; human factors; management of change; project management; railway industry; railway safety; culture change management; human factor; lead independent safety assessor; railway industry; safety case; signalling project; stakeholder; train detection method;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Railway Signalling and Control Systems, 2006. The 11th IET Professional Development Course on
  • Conference_Location
    York
  • Type

    conf

  • Filename
    1662127