Rogs - a different approach to acceptance
Author
Harman, Ian
Author_Institution
Railway System Engineer, Network Rail
fYear
2007
fDate
7-8 Nov. 2007
Firstpage
1
Lastpage
21
Abstract
. Under ROGS, Authorisation into use of non-Interoperable projects or equipment delegated to "Duty Holder" . Interoperable Projects continue to require authorisation from ORR (HMRI) . NR has established process for compliance with Regs through its "Network Rail Acceptance Panel", and delegated Systems Review Panels. . Network Rail policy to carry out Safet Verification of non-Interoperable projects using owvn staff (2nd Party approach) . More emphasis in NR on "end to end" safety assurance, and the duty of co-operation with others
fLanguage
English
Publisher
iet
Conference_Titel
Safety Assurance, 2007 Institution of Engineering and Technology Seminar on
Conference_Location
London, UK
ISSN
0537-9989
Print_ISBN
978-0-86341-869-3
Type
conf
Filename
4417104
Link To Document