• DocumentCode
    501952
  • Title

    Developing a maintenance and replacement cabling strategy for medium and low voltage overhead lines - A practical approach

  • Author

    Schaffer, Walter ; Armellini, Manfred ; Rieder, Thomas

  • Author_Institution
    Salzburg Netz GmbH - Austria
  • fYear
    2009
  • fDate
    8-11 June 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The specific maintenance costs of medium and low voltage overhead lines with wood poles are up to ten times higher compared to cables. A way of estimating the costs for the replacement cabling and the maintenance as accurate as possible for the economic appraisal as well as the economic appraisal itself is shown in this paper. The cost estimation is automated based on the maintenance software tool and the geographic information system. Since improvements of the supply situation are achieved with replacement cabling they have to be evaluated and taken into account.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
  • Conference_Location
    Prague, Czech Republic
  • ISSN
    0537-9989
  • Print_ISBN
    978-1-84919126-5
  • Type

    conf

  • Filename
    5255283