• DocumentCode
    502236
  • Title

    Adoption of a process-orientated organisation and “status indicator for network operations” to optimise asset management

  • Author

    Worle, Hubert

  • Author_Institution
    TIWAG-Netz AG Thaur - Austria
  • fYear
    2009
  • fDate
    8-11 June 2009
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    TIWAG Netz AG was founded on 1.1.2006, as a result of statutory unbundling for the operation of networks. Steps had been taken years before, however, to convert the highly decentralised structure of the grid operator into a centralised structure. This reorganisation was completed in 2006. Inevitably operations and personnel have since had to change.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
  • Conference_Location
    Prague, Czech Republic
  • ISSN
    0537-9989
  • Print_ISBN
    978-1-84919126-5
  • Type

    conf

  • Filename
    5255647