DocumentCode
502791
Title
The multi-technics projects optimization of interim production based on the group decision criteria strategy
Author
ZhenQing, Miao
Author_Institution
Zhongyuan Univ. of Technol., Zhengzhou, China
Volume
2
fYear
2009
fDate
8-9 Aug. 2009
Firstpage
331
Lastpage
333
Abstract
Aiming at the industrial product process constituted by multi-techniques and multi-branch, the best producing technics project is achieved by the judge method that is combined by colony unanimous rule with avail-maximizing rule among multi-branch. The block´s electricity-installing in shipbuilding is chosen to be optimized, by the sample, it avoids the optimizing of multifarious maths and the preferences in multi-phases. the method is effective to support multi-technics projects´ decision-making in the actual produce and management.
Keywords
group decision support systems; production engineering computing; production management; shipbuilding industry; Interim production; colony unanimous rule; group decision criteria strategy; industrial product process; multitechnics project decision-making; multitechnics projects optimization; shipbuilding; Arithmetic; Buildings; Communication industry; Communication system control; Decision making; Energy management; Optimization methods; Optimized production technology; Project management; Technology management; colony; management; optimization; produce; technics;
fLanguage
English
Publisher
ieee
Conference_Titel
Computing, Communication, Control, and Management, 2009. CCCM 2009. ISECS International Colloquium on
Conference_Location
Sanya
Print_ISBN
978-1-4244-4247-8
Type
conf
DOI
10.1109/CCCM.2009.5267933
Filename
5267933
Link To Document