DocumentCode
515312
Title
Modeling for the operation of closed-loop supply chain with remanufacturing
Author
Xu, Jiawang ; Zhu, Yunlong
Author_Institution
Key Lab. of Ind. Inf., Chinese Acad. of Sci., Shenyang, China
Volume
1
fYear
2010
fDate
9-10 Jan. 2010
Firstpage
69
Lastpage
73
Abstract
The operation process for a class of closed-loop supply chain system with remanufacturing is considered. In this system, the manufacturer is in charge of reclaiming and re-disposal of the returned products. The remanufacturing costs like operation costs for disassembling collected product and refurbishing disassembled part, and disposal costs of disassembled part are all uncertain. Based on the early research results, an operation model is constructed to maximize the total profits by optimally deciding the number of purchased parts from external suppliers, the quantity of parts to be processed at each remanufacturing facilities. A numerical example is designed, and the results shown that the model is both solution-robust and model-robust.
Keywords
costing; recycling; supply chains; closed-loop supply chain; disassembling; profit maximization; remanufacturing cost; returned products reclaiming; returned products redisposal; Costs; Informatics; Laboratories; Manufacturing industries; Reverse logistics; Robustness; Supply chain management; Supply chains; Uncertainty; Virtual manufacturing; Closed-loop Supply Chain; Remanufacturing; Robustness; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Logistics Systems and Intelligent Management, 2010 International Conference on
Conference_Location
Harbin
Print_ISBN
978-1-4244-7331-1
Type
conf
DOI
10.1109/ICLSIM.2010.5461466
Filename
5461466
Link To Document