DocumentCode
519364
Title
The Research of Workshop Scheduling for Job Production
Author
Liu, Xiaoqing ; Tu, Haining
Author_Institution
Coll. of Mech. Eng., Nanchang Univ., Nanchang, China
Volume
1
fYear
2010
fDate
5-6 June 2010
Firstpage
341
Lastpage
344
Abstract
Using the Job Production as model to study the Workshop Scheduling, the mainly considered objectives are the assembly relationships of workpieces and the most optimal Makespan. First of all, according to the extracted product assembly sub-tree to obtain the weights of all workpieces, utilizing directed graph of job shop to ensure the constraint relations between various parts in processing. And then, it can through the rough scheduling to get all the possible process chains. Finally, by way of the detailed scheduling, it can quickly get the most optimal process chain. In the detailed scheduling, it mainly uses the WSPT rule, and the goals of primary consideration are the total weighted completion time and constraint relationships of workpieces between parent node and child nodes. After example analysis and exhaustive proof, it shows the Makespan under this scheduling model is the most optimal, and it has practical significance in the actual production.
Keywords
assembling; directed graphs; job shop scheduling; assembly relationships; directed graph; job production; optimal makespan; product assembly sub-tree; rough scheduling; total weighted completion time; weighted shortest processing time rule; workshop scheduling; Industrial engineering; Job production systems; Job Production; Makespan; Workshop Scheduling; process chains;
fLanguage
English
Publisher
ieee
Conference_Titel
Computing, Control and Industrial Engineering (CCIE), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-0-7695-4026-9
Type
conf
DOI
10.1109/CCIE.2010.93
Filename
5492099
Link To Document