DocumentCode
535813
Title
Research on risk assessment of dam removal
Author
Qi, Chang-Qing
Author_Institution
Bus. Sch., Hohai Univ., Nanjing, China
Volume
2
fYear
2010
fDate
9-10 Oct. 2010
Firstpage
185
Lastpage
188
Abstract
This paper identifies the risks of removing dams and sorts the risks into five categories, namely, life risk, economic risk, technological risk, environmental risk and social risk. On this basis, this paper builds a risk index system of removing dams. By using TOPSIS-AHP model, the paper constructs a risk assessment model of dam removal.
Keywords
dams; decision making; risk management; TOPSIS-AHP model; analytic hierarchy process; dam removal; economic risk; environmental risk; life risk; risk assessment model; risk index system; social risk; technological risk; Biological system modeling; dam removal; risk assessment; risk management;
fLanguage
English
Publisher
ieee
Conference_Titel
Future Information Technology and Management Engineering (FITME), 2010 International Conference on
Conference_Location
Changzhou
Print_ISBN
978-1-4244-9087-5
Type
conf
DOI
10.1109/FITME.2010.5654724
Filename
5654724
Link To Document