• DocumentCode
    535813
  • Title

    Research on risk assessment of dam removal

  • Author

    Qi, Chang-Qing

  • Author_Institution
    Bus. Sch., Hohai Univ., Nanjing, China
  • Volume
    2
  • fYear
    2010
  • fDate
    9-10 Oct. 2010
  • Firstpage
    185
  • Lastpage
    188
  • Abstract
    This paper identifies the risks of removing dams and sorts the risks into five categories, namely, life risk, economic risk, technological risk, environmental risk and social risk. On this basis, this paper builds a risk index system of removing dams. By using TOPSIS-AHP model, the paper constructs a risk assessment model of dam removal.
  • Keywords
    dams; decision making; risk management; TOPSIS-AHP model; analytic hierarchy process; dam removal; economic risk; environmental risk; life risk; risk assessment model; risk index system; social risk; technological risk; Biological system modeling; dam removal; risk assessment; risk management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Future Information Technology and Management Engineering (FITME), 2010 International Conference on
  • Conference_Location
    Changzhou
  • Print_ISBN
    978-1-4244-9087-5
  • Type

    conf

  • DOI
    10.1109/FITME.2010.5654724
  • Filename
    5654724