DocumentCode
536708
Title
Application of Gray Fuzzy Theory for Transformer Substation Construction Project Post-Evaluation
Author
Zhang Wei ; Zhang Gui-qin ; Qie Xiao-He
Author_Institution
Sch. of Bus. & Manage., Dept. of Project Manage., NCEPU, Beijing, China
fYear
2010
fDate
7-9 Nov. 2010
Firstpage
1
Lastpage
4
Abstract
Taking the fuzzy and grey features of transformer substation construction project into account, this paper classified the evaluation system of transformer substation construction project into 4 indexes of grade A and 13 indexes of grade B. The weight of each index is decided reasonably by the Analytic Hierarchy Process (AHP).The grey number and the grey evaluating weight of each index are obtained by the grey theory, the grey fuzzy weight matrix is formed, and the grey fuzzy comprehensive evaluating matrix is obtained. Then the grade of the evaluated subject can be calculated, to get the evaluation outcome.
Keywords
construction; decision making; fuzzy systems; grey systems; project management; transformer substations; analytic hierarchy process; gray fuzzy theory; grey evaluating weight; grey fuzzy weight matrix; grey number; transformer substation construction project; Bismuth; Electricity; Indexes; Project management; Substations; Weight measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Product E-Service and E-Entertainment (ICEEE), 2010 International Conference on
Conference_Location
Henan
Print_ISBN
978-1-4244-7159-1
Type
conf
DOI
10.1109/ICEEE.2010.5660464
Filename
5660464
Link To Document