  • Title

    Hydro power plant governor testing using hardware-in-the-loop simulation

  • Author

    Zaev, Emil ; Tuneski, Atanasko ; Babunski, Darko ; Trajkovski, Laze ; Nospal, Aleksandar ; Rath, Gerhard

  • Author_Institution
    Fac. of Mech. Eng., Ss. Cyril & Methodius Univ., Skopje, Macedonia
  • fYear
    2012
  • fDate
    19-21 June 2012
  • Firstpage
    271
  • Lastpage
    274
  • Abstract
    Today Hardware-in-the-loop is standard testing procedure in controller design procedure. Once the design of the controller is completed using off-line desktop simulations and the algorithm is transferred in C code, it is necessary to test the code as well as the final controller for his capabilities of running in real-time. In the process of designing the hydro turbine speed governor this is more than necessary since the controller and the real hydraulic actuator are integrated part. With the purpose of real-time testing of the controllers for hydropower plant speed governors a general model of a Hydro power plant with Francis turbine is created using Matlab/Simulink. The model is then translated to C code using Matlab Real-Time Workshop and run in real-time on a powerful industrial PLC. Through I/O interface the virtual hydro power plant and real speed governor (actuator together with controller) are combined as a closed loop control system. Easy parameter changing and monitoring of the whole process is accomplished through PC program which is in communication with the real-time simulation system through Object Linking and Embedding (OPC) connection. With this testing bench the controller can be tested in two ways: together with the real hydraulic actuator or a scaled physical model of it, if the real hydraulic actuator is available or with the real-time model of the hydraulic actuator if the real hydraulic actuator is not available. In this way we can examine and adjust the performance of governor before installing it to the power plant. By using this test system, the efficiency and security of the speed governor can be improved.
  • Keywords
    closed loop systems; hydraulic actuators; hydraulic turbines; hydroelectric power stations; power engineering computing; power generation control; real-time systems; C code; Francis turbine; I/O interface; Matlab Real-Time Workshop; Matlab/Simulink; closed loop control system; controller design procedure; embedding connection; hardware-in-the-loop simulation; hydraulic actuator; hydro power plant governor testing; hydro turbine speed governor; object linking connection; off-line desktop simulations; real speed governor; real-time testing; virtual hydro power plant; Real time systems; Yttrium; governor; model; power plant; real-time; simulation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Embedded Computing (MECO), 2012 Mediterranean Conference on
  • Conference_Location
    Bar
  • Print_ISBN
    978-1-4673-2366-6
  • Type

    conf

  • Filename
    6268976