DocumentCode
577582
Title
Estimate method to solve the time lag of sintering forecast
Author
Zhang, Tao ; Li, Fujin
Author_Institution
Coll. of Inf., Hebei United Univ., Tangshan, China
fYear
2012
fDate
6-8 July 2012
Firstpage
359
Lastpage
361
Abstract
Sintering end control systems generally lag, if the destination ahead of sintering, the sintering time is too long, sintering heat, so less than the blast furnace sinter production of each component content. If the backward end of sintering, sintering not fully carried out, part of the sintering machine in the ring on a cold, cold cooling ring less than the required temperature, resulting in sintering temperature as the feed belt to blast furnace burning, leading to the back process can not proceed. Using estimate method to implement burn-through point forecast can be a good solution to this problem.
Keywords
belts; blast furnaces; combustion; cooling; forecasting theory; sintering; blast furnace burning; blast furnace sinter production; burn-through point forecast; cold cooling ring; feed belt; sintering end control system; sintering forecast; sintering heat; time lag; Bellows; Delay; Fuzzy control; Process control; Temperature control; Temperature distribution; burn-through point; fuzzy control; lag;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation (WCICA), 2012 10th World Congress on
Conference_Location
Beijing
Print_ISBN
978-1-4673-1397-1
Type
conf
DOI
10.1109/WCICA.2012.6357899
Filename
6357899
Link To Document