A new method to solve project scheduling problems with multi-skilled workforce constraints
Author
Wang Yi-fan ; Sun Fu-quan ; Liu Shi-xin ; Chen Di
Author_Institution
Coll. of Inf. Sci. & Eng., Northeastern Univ., Shenyang, China
fYear
2013
fDate
25-27 May 2013
Firstpage
2408
Lastpage
2412
Abstract
With the developing of technology and economic of society, skilled workforce has been playing as the key role through the trend of prosperity. Project scheduling problems with multi-skilled workforce constraints (PSPMSWC) have become a research hotpot in the field of human resource allocation and project scheduling. Following the description and model of the PSPMSWC, a hybrid Benders decomposition (HBD) algorithm is presented in detail as well as the scheme of total solving process with heuristic inferring. After the programming and solving operation, results are gathered and analyzed afterward with conclusion at last.
Keywords
combinatorial mathematics; human resource management; optimisation; personnel; project management; resource allocation; scheduling; HBD algorithm; PSPMSWC; heuristic inference; human resource allocation; hybrid Benders decomposition algorithm; multiskilled workforce constraints; project scheduling problem; Algorithm design and analysis; Job shop scheduling; Optimized production technology; Resource management; Schedules; Heuristic inferring; Hybrid Benders decomposition; Multi-skilled workforce; Project Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (CCDC), 2013 25th Chinese
Conference_Location
Guiyang
Print_ISBN
978-1-4673-5533-9
Type
conf
DOI
10.1109/CCDC.2013.6561342
Filename
6561342
Link To Document