DocumentCode
669066
Title
Study on production line balancing based on heuristic balancing algorithm
Author
Shan Hongying ; Hu Lulu ; Guan Qingzhu
Author_Institution
Dept. of Ind. Eng., Jilin Univ., Changchun, China
Volume
3
fYear
2013
fDate
23-24 Nov. 2013
Firstpage
485
Lastpage
488
Abstract
The benefit of balancing production line is the help that the workers and facilities increase the operational speed or efficiency. Utilize work measurement method to collect one production line balancing data, through the analysis of work time of stations, a work time chart was drawn. Then it utilized heuristic balancing algorithm to redesigned work process. From the comparison of the indicators before and after for the production line balancing, it turned out that balance efficiency of the production line is significantly improved.
Keywords
assembling; production management; heuristic balancing algorithm; operational efficiency; operational speed; production line balancing; work measurement method; work process redesign; work time chart; Algorithm design and analysis; Assembly; Heuristic algorithms; Industrial engineering; Optimization; Production; Workstations; balance; heuristic balancing algorithm; production line;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2013 6th International Conference on
Conference_Location
Xi´an
Print_ISBN
978-1-4799-3985-5
Type
conf
DOI
10.1109/ICIII.2013.6703627
Filename
6703627
Link To Document