• DocumentCode
    669066
  • Title

    Study on production line balancing based on heuristic balancing algorithm

  • Author

    Shan Hongying ; Hu Lulu ; Guan Qingzhu

  • Author_Institution
    Dept. of Ind. Eng., Jilin Univ., Changchun, China
  • Volume
    3
  • fYear
    2013
  • fDate
    23-24 Nov. 2013
  • Firstpage
    485
  • Lastpage
    488
  • Abstract
    The benefit of balancing production line is the help that the workers and facilities increase the operational speed or efficiency. Utilize work measurement method to collect one production line balancing data, through the analysis of work time of stations, a work time chart was drawn. Then it utilized heuristic balancing algorithm to redesigned work process. From the comparison of the indicators before and after for the production line balancing, it turned out that balance efficiency of the production line is significantly improved.
  • Keywords
    assembling; production management; heuristic balancing algorithm; operational efficiency; operational speed; production line balancing; work measurement method; work process redesign; work time chart; Algorithm design and analysis; Assembly; Heuristic algorithms; Industrial engineering; Optimization; Production; Workstations; balance; heuristic balancing algorithm; production line;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2013 6th International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4799-3985-5
  • Type

    conf

  • DOI
    10.1109/ICIII.2013.6703627
  • Filename
    6703627